By its Decision 245A/2021 (OGG Β΄2292/01.06.2021), the RAE approved the Ancillary and Invoiced Services pf the Distribution Networks of Thessaloniki and Thessaly and their unit prices, in effect until the 31st of December 2021. Until the new Table of Ancillary Services and their unit prices is put into effect, the Table approved pursuant to the RAE’s Decision 245A/2021 is the one to apply.
The 100% discount on the Connection Fees, as indicated in the Connection Fee tables, was extended by decision of RAE.
Service (α) Connection of new Delivery Points to the Distribution Network:
|
|||||||
|
CONNECTION TYPE |
FOR MAX CONNECTION LENGTH / m |
TYPE OF METER / REDUCER |
TOTAL COST - AREA OF THESSALONIKI (€) |
DISCOUNT % |
CONNECTION FEES - AREA OF THESSALONIKI € |
+ VAT 24% (€) |
Case 1 |
INDIVIDUAL HEATING - COMMERCIAL USE (SMALL SCALE) |
0 to 8 m. (SERVICE LINE and RISER) |
G4 / GRU10 |
1.202,23 |
100% |
0,00 |
0,00 |
Case 2 |
INDIVIDUAL HEATING CENTRAL HEATING DOMESTIC/NON-COMMERCIAL COMMERCIAL USE (SMALL SCALE) |
0 to 8 m. (SERVICE LINE and RISER) |
G6 / GRU10 |
1.273,40 |
100% |
0,00 |
0,00 |
Case 3 |
0 to 8 m. (SERVICE LINE and RISER) |
0 to 8 m. (SERVICE LINE and RISER) |
G10 / GRU25 |
1.534,21 |
100% |
0,00 |
0,00 |
G16 / GRU25 |
1.534,21 |
100% |
0,00 |
0,00 |
|||
G25 / GRU50 |
1.672,49 |
100% |
0,00 |
0,00 |
|||
G40 / GRU70 |
2.175,61 |
100% |
0,00 |
0,00 |
|||
Case 4 |
INDIVIDUAL HEATING - MULTIPLE DELIVERY POINTS ON A SINGLE RISER OR AN ARRAY OF UP TO 3 METERS |
SERVICE LINE AND RISER 0 to 8 m. and RISER up to 5 m. for each meter |
G4 |
554,80 |
100% |
0,00 |
0,00 |
FOR EVERY ADDITIONAL METER |
24,77 |
0% |
24,77 |
30,71 |
|||
Case 5 |
INDIVIDUAL HEATING - MULTIPLE DELIVERY POINTS ON A SINGLE RISER OR AN ARRAY OF UP TO 3 METERS |
SERVICE LINE and RISER 0 to 8 m. and RISER up to 5 m. for each meter |
G4 |
425,31 |
100% |
0,00 |
0,00 |
Case 6 |
INDIVIDUAL HEATING - DELIVERY POINT ON AN EXISTING RISER OR ARRAY INSTALLED BEFORE 31/12/2008 |
RISER up to 3 m. |
G4 |
195,24 |
100% |
0,00 |
0,00 |
Case 7 |
FOR CONSUMERS OF MORE THAN 9.051 m3/year |
THE CONNECTION FEE IS CALCULATED AD HOC |
100% |
0,00 |
0,00 |
*100% Discount- Activation in 60 days from the construction of the Delivery Point
In case 1 to 6 for every additional meter of the service line and the riser over the maximum length, as specified in the table above, is subject to an additional charge of €24,77 plus VAT.
In case a valve is installed at the riser branch of cases 1 to 6, there is an extra charge of €13,78 plus VAT.
DISTRIBUTION NETWORK - THESSALY |
|||||||
|
CONNECTION TYPE |
FOR MAX. CONNECTION LENGTH / m |
TYPE OF METER / REDUCER |
TOTAL COST - AREA OF THESSALY (€) |
DISCOUNT % |
CONNECTION FEES - AREA OF THESSALY € |
+ VAT 24% (€) |
Case 1 |
INDIVIDUAL HEATING - COMMERCIAL USE (SMALL SCALE |
0 to 8 m. (SERVICE LINE and RISER) |
G4 / GRU10 |
1.232,34 |
100% |
0,00 |
0,00 |
Case 2 |
INDIVIDUAL HEATING CENTRAL HEATING DOMESTIC/NON-COMMERCIAL COMMERCIAL USE (SMALL SCALE) |
0 to 8 m. (SERVICE LINE and RISER) |
G6 / GRU10 |
1.303,70 |
100% |
0,00 |
0,00 |
Case 3 |
0 to 8 m. (SERVICE LINE and RISER) |
0 to 8 m. (SERVICE LINE and RISER) |
G10 / GRU25 |
1.567,01 |
100% |
0,00 |
0,00 |
G16 / GRU25 |
1.567,01 |
100% |
0,00 |
0,00 |
|||
G25 / GRU50 |
1.705,28 |
100% |
0,00 |
0,00 |
|||
G40 / GRU70 |
2.210,99 |
100% |
0,00 |
0,00 |
|||
Case 4 |
INDIVIDUAL HEATING - MULTIPLE DELIVERY POINTS ON A SINGLE RISER OR AN ARRAY OF UP TO 3 METERS |
SERVICE LINE AND RISER 0 to 8 m. and RISER up to 5 m. for each meter |
G4 |
567,69 |
100% |
0,00 |
0,00 |
FOR EVERY ADDITIONAL METER |
22,75 |
0% |
22,75 |
28,21 |
|||
Case 5 |
INDIVIDUAL HEATING - MULTIPLE DELIVERY POINTS ON A SINGLE RISER OR AN ARRAY OF UP TO 3 METERS |
SERVICE LINE and RISER 0 to 8 m. and RISER up to 5 m. for each meter |
G4 |
434,76 |
100% |
0,00 |
0,00 |
Case 6 |
INDIVIDUAL HEATING - DELIVERY POINT ON AN EXISTING RISER OR ARRAY INSTALLED BEFORE 31/12/2008 |
RISER up to 3 m. |
G4 |
198,10 |
100% |
0,00 |
0,00 |
Case 7 |
FOR CONSUMERS OF MORE THAN 9.051 m3/year |
THE CONNECTION FEE IS CALCULATED AD HOC |
100% |
0,00 |
0,00 |
*100% Discount- Activation in 60 days from the construction of the Delivery Point
In case 1 to 6, for every additional meter of the service line and the riser over the maximum length, as specified in the table above, there is an additional charge of €22,75 plus VAT.
In case a valve is installed at the riser branch of cases 1 to 6, there is an extra charge of €13,78 plus VAT.
Service (b) Installation and maintenance of smart metering systems, including support equipment:
Meter Type |
Cost - Thessaloniki (€) |
Cost - Thessaly (€) |
G4 |
87,66 € |
87,69 € |
G6 |
124,66 € |
124,69 € |
G10 |
174,66 € |
174,69 € |
G16 |
274,66 € |
274,69 € |
G25 |
374,66 € |
374,69 € |
PTZ volume corrector with telemetry system |
862,16 € |
862,19 € |
Service (c) Emergency technical inspections at the pressure metering and regulating stations of the Delivery Points, upon request of the Distribution User or the End Consumer:
Free of charge
Service (d) Installation of telemetry equipment in the existing Delivery Points, upon request of the Distribution User or the End Consumer:
Meter Type |
Cost – Thessaloniki (€) |
Cost - Thessaly (€) |
G4 |
87,66 € |
87,69 € |
G6 |
124,66 € |
124,69 € |
G10 |
174,66 € |
174,69 € |
G16 |
274,66 € |
274,69 € |
G25 |
374,66 € |
374,69 € |
PTZ volume corrector with telemetry system |
862,16 € |
862,19 € |
Service (e) Relocation of part of the existing Distribution Network upon request of the End Consumer or the Distribution User:
Charge ad hoc
Service (f) Modification of the External Installation, upon request of the End Consumer:
Charge ad hoc
Service (g) dismantling of part or the whole of the External Installation, either upon request of the Distribution User or End Consumer, or upon termination of the Connection Contract:
Charge ad hoc
Service (h) Cut-off of supply or deactivation of part or whole of the External Installation, either upon request of the Distribution User or End Consumer, or upon termination of the Connection Contract:
|
THESSALONIKI |
THESSALY |
Shut-down Cost |
Shut-down Cost |
|
Meter G4 to G40 (Cut-off following a request of the Distribution User upon request of the End Consumer) |
20,83 € |
20,81 € |
Meter >G40 (Cut-off following a request of the Distribution User upon request of the End Consumer) |
27,20 € |
27,03 € |
Meter G4 to G40 (Cut-off upon request of the Distribution User) |
22,24 € |
22,21 € |
Meter >G40 (Cut-off upon request of the Distribution User) |
28,60 € |
28,43 € |
Meter G4 to G40 (Cut-off on the Initiative of EDA THESS) |
23,99 € |
24,01 € |
Meter >G40 (Cut-off on the Initiative of EDA THESS) |
30,36 € |
30,23 € |
Service (i) Reactivation of part of whole of the External Installation following Cut-off, upon request of the End Consumer or the Distribution User:
|
THESSALONIKI |
THESSALY |
Reactivation Cost |
Reactivation Cost |
|
Meter G4 to G40 (Meter Reactivation following Cut-off following a request of the Distribution User upon request of the End Consumer) |
22,16 € |
22,19 € |
Meter >G40 (Meter Reactivation following Cut-off following a request of the Distribution User upon request of the End Consumer) |
28,53 € |
28,40 € |
Meter G4 to G40 (Meter Reactivation following Cut-off upon request of the Distribution User) |
22,16 € |
22,19 € |
Meter >G40 (Meter Reactivation following Cut-off upon request of the Distribution User) |
28,53 € |
28,40 € |
Meter G4 to G40 (Meter Reactivation following Cut-off on the Initiative of EDA THESS) |
22,16 € |
22,19 € |
Meter >G40 (Meter Reactivation following Cut-off on the Initiative of EDA THESS) |
28,53 € |
28,40 € |
Service (j) Disconnection of an End Consumer by intervening on the External Installation:
|
THESSALONIKI |
THESSALY |
Disconnection Cost |
Disconnection Cost |
|
Cutting off the Riser through Simple intervention |
104,28 € |
104,27 € |
Cutting off the Riser using a Ladder |
104,28 € |
104,27 € |
Cutting off the Riser using Lifting Equipment (up to 24 meters)* |
804,21 € |
803,74 € |
Cutting off the Riser using Lifting Equipment (over 24 meters)* |
964,21 € |
963,74 € |
Cutting off the Riser using Lifting Equipment (Special Cases)* |
1.084,21 € |
1.083,74 € |
Cutting off the Riser using a Scaffold |
201,83 € |
200,41 € |
•Cutting off the Riser’s Valve through Simple intervention |
34,48 € |
34,47 € |
•Shutting off the Riser’s Valve using a Ladder •Shutting off the safety valve |
34,48 € |
34,47 € |
• Shutting off the Riser’s Valve using Lifting Equipment (Up to 24 meters) |
724,44 € |
724,20 € |
• Shutting off the Riser’s Valve using Lifting Equipment (Up to 24 meters) |
884,44 € |
884,20 € |
• Shutting off the Riser’s Valve using Lifting Equipment (Special Cases) |
1.004,44 € |
1.004,20 € |
• Shutting off the Riser’s Valve using a Scaffold |
132,03 € |
130,61 € |
Excavation cutting off the Service Line |
462,08 € |
460,66 € |
•Sealing of the valve before the reducer |
34,98 € |
34,97 € |
Shutting off the Buried GRM Valve |
34,48 € |
34,47 € |
* The cost includes the transfer of the lifting equipment on the work site, the use of the equipment at any height of the building by a specialized driver, the maintenance, wear and the removal of the equipment after the completion of the works.
Service (j) Reconnection of an End Consumer with intervention in the External Installation:
|
THESSALONIKI |
THESSALY |
Reconnection Cost |
Reconnection Cost |
|
Reconnection of the Riser through Simple Intervention |
101,12 € |
100,88 € |
Reconnection of the Riser using a Ladder |
101,12 € |
100,88 € |
Reconnection of the Riser using Lifting Equipment (Up to 24 meters) |
801,06 € |
800,34 € |
Reconnection of the Riser using Lifting Equipment (Over 24 meters) |
961,06 € |
960,34 € |
Reconnection of the Riser using Lifting Equipment (Special Cases) |
1.081,06 € |
1.080,34 € |
Reconnection of the Riser using a Scaffold |
198,68 € |
197,02 € |
•Reconnection opening the Riser’s Valve through Simple Intervention |
26,69 € |
26,45 € |
•Reconnection opening the Riser’s Valve using a Ladder |
26,69 € |
26,45 € |
•Reconnection opening the Riser’s Valve using Lifting Equipment (Up to 24 meters) |
716,66 € |
716,18 € |
•Reconnection opening the Riser’s Valve using Lifting Equipment (Over 24 meters) |
876,66 € |
876,18 € |
•Reconnection opening the Riser’s Valve using Lifting Equipment (Special Cases) |
996,66 € |
996,18 € |
•Reconnection opening the Riser’s Valve using a Scaffold |
124,25 € |
122,59 € |
Reconnection following disconnection through Excavation and cut-off of the Service Line |
479,55 € |
477,89 € |
•Reconnection following disconnection through valve sealing before the reducer |
27,19 € |
26,95 € |
Reconnection opening the Buried GRM Valve |
26,69 € |
26,45 € |
Service (k) Inspection of existing Internal Installations following the cut-off of the supply and/or disconnection, for safety reasons:
Free of charge
Service (l) Meter Check or calibration upon request of the End Consumer or the Distribution User:
|
THESSALONIKI |
THESSALY |
Meter Type |
Cost |
Cost |
G4 |
45,49 € |
45,52 € |
G6 |
58,68 € |
58,70 € |
G10 |
80,84 € |
80,89 € |
G16 |
80,84 € |
80,89 € |
G25 |
80,84 € |
80,89 € |
G40 |
80,84 € |
80,89 € |
G65 (Diaph) |
93,58 € |
93,33 € |
G65 (T/R) |
259,94 € |
259,69 € |
G100 (T) |
270,08 € |
269,83 € |
G100 (R) |
285,30 € |
285,05 € |
G160 |
310,66 € |
310,41 € |
G250 |
361,38 € |
361,13 € |
G400 |
412,10 € |
411,85 € |
G650 |
462,82 € |
462,57 € |
G1000 |
614,98 € |
614,73 € |
G1600 |
716,42 € |
716,17 € |
G2500 |
2.085,86 € |
2.085,61 € |
Service (m) Recording of readings by the Operator upon request of the End Consumer or the Distribution User, with a frequency different than the one specified by the Metering Regulation:
Free of charge
Service (n) Provision of information about potential future supply regarding a connection application that has been temporarily rejected:
Free of charge